Description
Alpentransversale Zürich – Chiasso
Driving through the illuminated Gotthard Base Tunnel (Photo: Andreas Perren)
track sections
- Zurich HB – Chiasso (via Gotthard and Ceneri base tunnel) (2h 13’29”)
railway companies
SBB
specialties
The Gotthard Base Tunnel (57 km long, opened in 2016) and the Ceneri Base Tunnel (15 km long, opened in 2020) are the two largest structures on the new Alpine Transverse. Both railway tunnels were built with a single tube each, relieve the old mountain routes and bring advantages especially for transit freight traffic. The cab ride starts in Zurich and ends at the Chiasso border station. As an exception, the tunnel lighting was switched on in both tunnels for the film ride! So a heartfelt thank you to the SBB.
An example
Excerpts from the disc “Alpine Transversal Zurich – Chiasso”
Video production
Length (total) | 2h 13’29” |
picture format | DVD: Breitbildformat 16:9 Bluray-Disc: 1080 50i |
Ton | Dolby Digital 5.1, stereo |
Camera | Andreas Perren |
editing | daniel felix |
Realisation | Andreas Perren |